Rutherford High School

Rutherford High School hired Vision Integration to provide a high-end audio/video system in their newly constructed gymnasium. This facility utilizes ten powered Renkus Heinz loudspeakers to deliver clear and concise audio throughout the gym, whether delivering voice for their sporting events or showing a presentation to the student body. In addition, it offers fully integrated control of all systems with Crestron Control Systems. There are is fully custom wall-mounted rack located in the equipment closet, which houses all necessary audio, video, and control equipment. There are 2 custom wall plates installed in remote areas to allow for connection of multiple audio and video sources.

Chief Engineer and Programmer: Scott Daniel

Project Manager: Gary Baria

Equipment Included:

  • Crestron Control System

  • Extron Switching Systems

  • Eiki Projectors

  • Renkus Heinz Sound Equipment

  • QSC Audio Systems

  • Wireless Microphone System

  • Custom Wall-Mount Rack System

  • Remote Wall-Plate Interfaces

Enterprise High School

After the community experienced the tragedy of a tornado destroying their existing school, it sought out Vision Integration to provide a state of the art solution in their new structure. The project was both designed and managed by Vision Integration.

The entire $1.6 million project utilizes a fully integrated control of all systems, including over 100 classrooms with Smart boards and Extron control systems. There are two state-of-the-art gymnasiums with Meyer sound systems and full control. The auditorium is equipped with a professional theater, staging and audio systems.

Chief Engineer: Scott Daniel

Project Manager: Gary Baria

Programmer: Larry Eckels

Equipment Included:

  • Crestron Control System

  • Extron Pole-Vault Systems

  • Smart boards

  • Meyer Sound Equipment

  • QSC Audio Systems

  • CATV System over Fiber

  • NEC Projectors

  • NEC Monitors